Shandong Keshiman Environmental Technology Co., Ltd. has launched a skid-mounted oil and gas recovery system. This system integrates all oil and gas recovery components onto a unified skid, treating hydrocarbon mixtures generated during oil storage and transportation and providing a complete equipment solution for oil and gas collection and treatment.
I. Product Introduction
This equipment features an integrated skid-mounted structure. Piping, valves, instruments, and the core processing unit are pre-assembled and integrated at the factory. The main body can employ a combination of adsorption and condensation processes. The equipment treats oil and gas mixtures released during loading, unloading, and storage, separating and recovering hydrocarbon components. The recovered liquid oil can be stored in tanks for reuse, while the treated exhaust gas is discharged in accordance with relevant regulations.
The entire unit integrates a pretreatment unit, the main oil and gas recovery unit, an automatic monitoring system, and explosion-proof components. Its modular skid-mounted design facilitates transportation as a complete unit and on-site installation.
II. Main Product Features
Integrated skid-mounted prefabrication reduces on-site construction work and facilitates project implementation.
Equipped with an explosion-proof electrical control system, it is suitable for flammable and explosive oil and gas environments and provides basic safety monitoring functions.
It features an automated control system that can monitor operating parameters such as pressure, oil and gas concentration, and temperature in real time, and can issue warning signals when abnormalities occur.
The equipment has a compact overall layout and occupies relatively little space, making it suitable for renovation projects with limited site conditions.
It is relatively easy to disassemble, reassemble, and relocate, allowing for potential reuse when production layouts are adjusted.
The process combination can be adjusted according to the medium composition and processing gas flow rate to adapt to different operating conditions.
III. Usage Method
After the equipment is installed in place, personnel complete the foundation fixing, pipeline connections, electrical connections, and airtightness testing, and verify that the on-site medium, inlet gas flow rate, and other conditions are consistent with the equipment design parameters.
The oil and gas mixture generated during oil loading and unloading or tank breathing is conveyed to the equipment through the gas collection pipeline. It first passes through the pretreatment unit to remove entrained droplets and then enters the core recovery unit. Hydrocarbon components are separated, condensed, or adsorbed and enriched, converted into liquid oil, and collected in the oil collection tank. The remaining exhaust gas is further treated to meet emission standards.
After the adsorption unit has been operating for a certain period, vacuum desorption is performed according to the operating procedure to regenerate the adsorbent and ensure continuous operation.
During equipment operation, maintenance personnel can view operating data through the automatic control system and regularly inspect and maintain components such as filters and valves. When the equipment is shut down, the standard shutdown procedure should be followed, and internal purging and component maintenance should be performed to reduce the impact of impurity accumulation.
IV. Scope of Application
This equipment can be applied to oil depots, oil loading and unloading platforms, tank farms, and other sites where oil and gas are generated. It can treat oil and gas mixtures generated during the loading, unloading, and storage of light oils such as gasoline and naphtha, and can also be used for the recovery and treatment of certain solvent-based volatile organic gases.
For mixtures containing large amounts of particulate matter and heavy tar impurities, it is recommended to install a pretreatment device at the front end to reduce the impact of impurities on the internal units of the equipment.
During the equipment selection phase, an assessment of operating conditions should be conducted based on factors such as the type of medium, peak oil and gas flow rate, and the explosion-proof rating required at the site.
In summary, skid-mounted oil and gas recovery equipment, relying on an integrated skid structure and combined recovery processes, can collect and recover components from oil and gas emitted during oil storage and transportation. The equipment features minimal on-site installation work, a compact footprint, and automated monitoring and operation, making it suitable for various oil and gas emission scenarios such as oil depots and loading and unloading stations.
Before application, a preliminary assessment based on the on-site medium, gas flow rate, and safety conditions is necessary, and pretreatment and safety support facilities should be provided as required.
This equipment is an optional complete set of oil and gas treatment equipment, providing a technical solution for oil and gas collection and treatment.